Solar Project Work Accomplised By Us
Total Capacity:
9522.38
(MW)
S.No.
Project Name
Client Name
Capacity (MW)
1
Topographical Survey, Contouring, Electrical Resistivity Test (ERT), Geotechnical Investigation, Chemical Testing of Soil for proposed Two Solar Plants Near Phalodi, Jodhpur, Rajasthan
Astonfield Solar Pvt. Ltd.
55
2
Topographical Survey, Contouring, Electrical Resistivity Test (ERT), Geotechnical Investigation, for proposed Green Infra Ltd. Solar Plants Baap Phalodi, Jodhpur, Rajasthan
Juwi India Renewable Energy Pvt. Ltd.
30
3
Land Surveying and Stake out of all foundation points in Rajasthan First solar project by Reliance India Ltd., at Khimsar, Nagaur, Rajasthan
Ramawat Construction Pvt. Ltd.
5
4
Quantity Estimation, Execution of construction, Pile Foundation Layout Marking at MoserBaer Solar Park at Patan Gujarat.
Ramawat Construction Pvt. Ltd.
30
5
Contour Survey, True North Survey, Foundation Marking at MoserBaer Solar Project at Tinwari, Jodhpur Rajasthan
Ramawat Construction Pvt. Ltd.
5
6
Contour Survey, Boundary Survey & Foundation Marking at AES Solar Project at Tinwari, Jodhpur Rajasthan
Ramawat Construction Pvt. Ltd.
5
7
Contour Survey, Boundary Survey & Foundation Marking at Astonfield Solar Project at Osian, Jodhpur Rajasthan
Ramawat Construction Pvt. Ltd.
5
8
Contour Survey, Boundary Survey & Foundation Marking at Refex Videocon Solar Project at Osian, Jodhpur Rajasthan
Ramawat Construction Pvt. Ltd.
5
9
Contour Survey, Boundary Survey, Earthwork Calculation& Foundation Marking at Aditya Birla Solar Project at Balotra, Barmer Rajasthan
Ramawat Construction Pvt. Ltd.
5
10
Stake Out of foundation , Leica Total Station on rent at Moserbaer Solar Project, Porbandar, Gujarat.
Ramawat Construction Pvt. Ltd.
50
11
Structure foundation marking at Vikram Solar Project, Manchitiya, Jaisalmer, Raj.
Surya International
40
12
Contour Survey, Boundary Survey, Earthwork Calculation & Foundation Marking at Abhijeet Group Thermal Solar Project at Nokh, Jaisalmer Rajasthan
Ramawat Construction Pvt. Ltd.
50
13
Stake Out of foundation and Estimation at Godavari Green Solar Thermal Power Project, Nokh, Jaisalmer, Raj.
Ramawat Construction Pvt. Ltd.
50
14
Point Stake out by Leica Total Station at Moserbaer Solar Project, Patdi, Surendra Nagar, Gujarat
Surya Heighon Pvt. Ltd.
30
15
Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Stakeout at Sun Edison Energy, Ugras Pokhran, Jaisalmer, Raj.
Juwi India Renewable Energy Pvt. Ltd.
25
16
Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground BMD, Pvt. Ltd. Solar PV Power Plant, Kolayat, Bikaner, Rajasthan
AEG Power Solutions (India) Pvt. Ltd.
5
17
Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground Oil India Ltd. Rajgarh, Jaisalmer, Rajasthan
MoserBaer Solar Ltd.
5
18
Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground, Pile Pullout Test, Lateral Load & compression Load Test, Oswal Woolen Mills Ltd. Solar ProjectKolayat, Bikaner, Rajasthan
AEG Power Solutions (India) Pvt. Ltd.
5
19
Topography Survey, Soil Testing, Electrical Resistivity Test at U.P. Ceramics & Potteries Ltd. Solar Power Plant, Bikaner, Rajasthan
U.P. Ceramics & Potteries Ltd.
2.5
20
Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Stakeout at KSK Energy Ventures Ltd. Solar Plant, Kolayat, Bikaner, Rajasthan.
Refex Energy Ltd.
10
21
Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Leica Total Station on Rent for Stake out at Atha Group Solar Plant, Kolayat, Bikaner, Rajasthan.
Refex Energy Ltd.
10
22
Topographical Survey By Total Station, True North Survey by Leica DGPS, Pullout Test, Soil Testing SPT, ERT Test & Stakeout at M/S Roha Dychem Pvt. Ltd, Solar Power Plant in Bhadla, Bap, Phalodi, Rajasthan.
Waaree Energies Pvt. Ltd.
28
23
Land Survey with DGPS GS10 and Leica Total Station on hire for Cepco Industries Pvt. Ltd.
Riti Energy Pvt. Ltd.
1
24
Land Survey with DGPS GS10 and Leica Total Station on hire for Agrawal Renewal Energy Pvt. Ltd.
Riti Energy Pvt. Ltd.
3
25
Pile foundation Pullout, Lateral & Compression Load Test, True North Survey and Bench mark (TBM) Fixing by Leica DGPS GS10. Stake out of Foundation. at NTPC 50MW Solar Power Project, EPC Contractor by TATA Solar, Rajgarh Madhya Pradesh(MP)
Nuevosol Energy Pvt. Ltd.
50
26
Topographical Survey, Geotechnical Investigation, ERT Testing, Pullout Test, Lateral Pile Load Test, True North Survey by DGPS. at Palimarwar Solar Project Pvt. Ltd. EPC by IBC Solar, Raaid Village Pokhran, Rajasthan
Palimarwar Solar Project Pvt. Ltd.
25
27
Pullout Test, & Lateral load Test as per IS 2911-Part4, Boundary Survey by DGPS & Stake out of all foundation Point on field by Total Station at Juwi India Solar Project, Shajapur, MP
Nuevosol Energy Pvt. Ltd.
50
28
Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at 96 MW ACME Solar Project, Bari Sid Village, Baap, Phalodi Jodhpur
Waaree Energies Pvt. Ltd. & Sunraign Energy Pvt. Ltd.
48
29
Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at 96 MW ACME Solar Project, Bari Sid Village, Baap, Phalodi Jodhpur
Nuevosol Energy Pvt. Ltd.
48
30
Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Vikram Solar Project, Agar, MP
Nuevosol Energy Pvt. Ltd.
50
31
Pullout Test, & Lateral load Test, Compression Test on Concrete Foundation as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Juwi India Renewable Energy Solar Project, Solar Park, Charnka, Gujarat
Nuevosol Energy Pvt. Ltd.
50
32
Pullout Test, & Lateral load Test on Concrete Foundation as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Solar Direct, Solar Project, Pokhran, Rajasthan
Nuevosol Energy Pvt. Ltd.
35
33
Pile foundation Pullout (Vertical) Load test, ERT Test, and stake out at Azure Power Solar Project, Baori, Jodhpur, Rajasthan
Azure Power Ltd.
100
34
Topographical Survey, Contouring Grid level at 5mx5m, Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at ACME Solar Project, Ichhawar, Bhopal, MP
Nuevosol Energy Pvt. Ltd.
100
35
Pullout Test as per IS 2911-Part4, Welspun Solar Tech Pvt. Ltd. Musiri, Tiruchirapplai, Tamil nadu.
Sub Contractors
200
36
Soil Testing at Moserbaer Solar Ltd. at Kharu Leh, J&K
MoserBaer Solar Ltd.
0.5
37
Survey at TecSo Global Pvt. Ltd. Solar Project.
Tecso Global Pvt. Ltd.
5
38
Pullout Test as per IS 2911-Part4, Azure Power India, Karnataka
Azure Power Ltd.
10
39
Pullout Test as per IS 2911-Part4, Azure Power India, Jaisalmer India Border
Azure Power Ltd.
5
40
Pullout Test as per IS 2911-Part4, Rays Power Infra.
Rays power infra ltd.
50
41
Pullout Test as per IS 2911-Part4, Juwi india Solar Project, Madurai, Tamilnadu.
Meera Enterprises
10
42
Pullout Test at ACME Dharamvaram, Anantpur, AP
Nuevosol Energy Pvt. Ltd.
50
43
Pullout Test at ACME Hindupur, Anantpur, AP
Nuevosol Energy Pvt. Ltd.
50
44
Pullout Test at GMR, International Airport Hyderabad
Nuevosol Energy Pvt. Ltd.
5
45
Pullout Test at Surya Urja Company of Rajasthan Ltd. & IL&FS Energy Joint venture 3rd Phase Solar Park at Bhadla, Jodhpur, Rajasthan
CEG Test House
1000
46
Pullout Test at 350MW Mahindra Solar Project Gani, Karnool, AP
Mahindra Susten Pvt. Ltd.
350
47
Pullout Test as per IS 2911-Part4, Azure Power India, Three Projects 40MW, 40MW & 50 MW Chitradurga, KA
Nuevosol Energy Pvt. Ltd.
130
48
Pullout Test as per IS 2911-Part4, Azure Power India, Karnool, Andhra Pradesh
Nuevosol Energy Pvt. Ltd.
100
49
Pullout Test as per IS 2911-Part4, 20MW Solair Direct ,Chegunta, Medak, Telangana
Nuevosol Energy Pvt. Ltd.
20
50
Topographical Survey, Contouring Grid level at 5mx5m, Pullout Test, & Lateral load Test as per IS 2911-Part4, at First Solar Tandur Telangana
Appoline
61.38
51
Pile foundation Pullout, Lateral & Compression Load Test, Torrent Power Surat
Waaree Energies Pvt. Ltd.
75
52
Pile foundation Pullout, Lateral & Compression LoadTest and Stakeout at Hindustan EPC, Punjab
Nuevosol Energy Pvt. Ltd.
35
53
Pile foundation Pullout, Lateral & Compression Load Test, RT Renewable Energy
Harsha Abukus
18
54
Pile foundation Pullout, Lateral & Compression Load Test, Trydence Group Ltd.
Tata International Ltd
5
55
Pile foundation Pullout, Lateral & Compression Load Test, Azure Power Bihar
Nuevosol Energy Pvt. Ltd.
10
56
Pile foundation Pullout, Lateral & Compression Load Test, Bosch
Tata International Ltd
5
57
Topographical Survey By Leica DGPS & Total Station at Plot no. 7 (NTPC) & 9 (Fortum) of Bhadla Solar Park II Jodhpur, Rajasthan
Tata Power Ltd.
140
58
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at Plot no. 1 & 2 of Bhadla Solar Park II Jodhpur, Rajasthan
Aright Green Power Pvt. Ltd.
140
59
Geotechnical Investigation,Earth Resistivity Test, Topographical Survey By Leica DGPS & Total Station at Plot no. 8&10 of Bhadla Solar Park II Jodhpur, Rajasthan
Solaire Surya Urja Pvt. Ltd.
140
60
Pullout Test as per IS 2911-Part4, 5MWp, Hindustan EPC Pvt. Ltd., Tezpur, Guwahati, Assam
Nuevosol Energy Pvt. Ltd.
5
61
Pullout Test as per IS 2911-Part4, 5MWp, Gamesa Renewable Pvt. Ltd. Solar Park, Uttarakhand
Nuevosol Energy Pvt. Ltd.
5
62
Pullout Test at Jaipur International Airport Ujaas Solar Power Plant
NK Infra Pvt. Ltd.
5
63
Pullout Test at 50 MWp Mansur MP
Lanco Solar Energy Pvt. Ltd.
50
64
Pullout Test at Madanapalle, Chittor AP
Sterling & Wilson Pvt. Ltd.
30
65
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at SkyPower Telangana 4x50 MWp
Sterling & Wilson Pvt. Ltd.
200
66
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at Atha Group 50 MWp
Sterling & Wilson Pvt. Ltd.
50
67
Pullout Test as per IS 2911-Part4, 100MW Orange Renewable Energy, Dhule Maharastra
Tata International Ltd
100
68
Pullout Test as per IS 2911-Part4, 69MW Suzlon, Dhule Maharastra
Tata International Ltd
69
69
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Transform Sun Energy, Telangana
Sterling & Wilson Pvt. Ltd.
100
70
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Azure Power, Telangana
Tata International Ltd
100
71
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Azure Power, UP
Tata International Ltd
30
72
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Mirzapur, UP
Nuevosol Energy Pvt. Ltd.
50
73
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at ESSEL Infra, Orai, UP
Nuevosol Energy Pvt. Ltd.
50
74
Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Gamesa, Karnataka
Gamesa Renewable Pvt. Ltd.
50
75
Pullout Test as per IS 2911-Part4, 30MW Orange Renewable Energy, Charanka, Gujarat
Nuevosol Energy Pvt. Ltd.
30
76
Geotechnical Investigation, Surveying, Earth Resistivity Test & Pile Pullout Test, Lateral Load & compression Load Test, APGENCO Plot 1 & 3
Vikram Solar
200
77
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Light Source at Wagdhary Maharashtra
Sterling & Wilson Pvt. Ltd.
50
78
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for JBM Solar at Chalis Gaon, Mahrashtra.
Sterling & Wilson Pvt. Ltd.
100
79
Pullout Test, & Lateral load Test, Compression Test on Concrete Foundation as per IS 2911-Part4, Chalis Gaon, Mahrashtra
Juwi India Renewable Energy Pvt. Ltd.
100
80
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Solar Edge Power at Jalgaon, Maharashtra
Sterling & Wilson Pvt. Ltd.
50
81
Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Infosys at Sira Karnataka
Anchor Electrical (Panasonic)
25
82
Pile foundation Pullout (Vertical), Lateral & Compression Load test for IL&FS Energy at Belgam, Karnataka
Sterling & Wilson Pvt. Ltd.
50
83
Pile foundation Pullout (Vertical), Lateral & Compression Load test for AMplus Solar at Karnataka
Sterling & Wilson Pvt. Ltd.
100
84
Pile foundation Pullout (Vertical), Lateral & Compression Load test for Rewa Solar Park at MP
Mahindra Susten Pvt. Ltd.
100
85
100 MW UPC Solar PV Power Plant
Sterling & Wilson Pvt. Ltd.
100
86
250 MW Solar PV Power Project
Belectric Photovoltaic India Pvt. Ltd.
250
87
SECI Rajasthan J(R8) 300 MW (Trench III)
Azure Power India Pvt. Ltd.
300
88
35 MW AC Solar PV Power Plant
Sterling & Wilson Pvt. Ltd.
35
89
300 MW Avaada Solar Power Project, Surendranagar Gujrat
Avaada Power Pvt. Ltd.
300
90
250 MW Solar PV Power Project
Belectric Photovoltaic India Pvt. Ltd.
250
91
NHPC 380 MW O2 Solar Power Project
Altra Xergi Power Pvt. Ltd.
380
92
300MW SBE Project, Pokhran
Soft Bank Six Pvt. Ltd.
300
93
150 MW Solar Power Project
Hild Energy Pvt. Ltd.
150
94
70 MW Solar Power Plant
Lalganj Power Pvt. Ltd.
70
95
300 MW Solar Power Project
Avaada Sunce Energy Pvt. Ltd.
300
96
390 MW Hybrid Project, Madhopura Jaisalmer Rajasthan
Adani Green Energy Ltd.
390
97
30 MW Amplus Solar Power Plant
Sterling & Wilson Pvt. Ltd.
30
98
40 MW Solar Pv Plant
CMES Power 2 Pvt. Ltd.
40
99
SECI ISTC 300 MW TRANCHE-4(R9)
Azure Power Maple Pvt. Ltd.
300
100
100 MW SPV Power Plant GSECL
BHEL
100
101
45 MW Solar PV Powre Plant AT Khadol Gujrat
Juniper Green Sigma Pvt. Ltd.
45
102
SPV AC/DC (80MW/112 MW) Solar Power Plant
Belectric Photovoltaic India Pvt. Ltd.
112
103
225 MW (AC) Solar Power Plant Sandur
JSW Renewable Energy
225
104
300 MW 2A Hybrid Project Kajasar
Adani Hybird Energy Jaislmer Two Ltd.
300
105
26 MW Wind-Solar Hybrid Power Project
Clean Max Powering Sustainability
26
106
190 MW Solar Park
Rising Sun Energy (k) Pvt. Ltd.
190