Projects

Solar Project Work Accomplised By Us

Total Capacity:9522.38(MW)
S.No.Project NameClient NameCapacity (MW)
1Topographical Survey, Contouring, Electrical Resistivity Test (ERT), Geotechnical Investigation, Chemical Testing of Soil for proposed Two Solar Plants Near Phalodi, Jodhpur, Rajasthan Astonfield Solar Pvt. Ltd.55
2Topographical Survey, Contouring, Electrical Resistivity Test (ERT), Geotechnical Investigation, for proposed Green Infra Ltd. Solar Plants Baap Phalodi, Jodhpur, Rajasthan Juwi India Renewable Energy Pvt. Ltd.30
3Land Surveying and Stake out of all foundation points in Rajasthan First solar project by Reliance India Ltd., at Khimsar, Nagaur, RajasthanRamawat Construction Pvt. Ltd.5
4Quantity Estimation, Execution of construction, Pile Foundation Layout Marking at MoserBaer Solar Park at Patan Gujarat.Ramawat Construction Pvt. Ltd.30
5Contour Survey, True North Survey, Foundation Marking at MoserBaer Solar Project at Tinwari, Jodhpur RajasthanRamawat Construction Pvt. Ltd.5
6Contour Survey, Boundary Survey & Foundation Marking at AES Solar Project at Tinwari, Jodhpur RajasthanRamawat Construction Pvt. Ltd.5
7Contour Survey, Boundary Survey & Foundation Marking at Astonfield Solar Project at Osian, Jodhpur RajasthanRamawat Construction Pvt. Ltd.5
8Contour Survey, Boundary Survey & Foundation Marking at Refex Videocon Solar Project at Osian, Jodhpur RajasthanRamawat Construction Pvt. Ltd.5
9Contour Survey, Boundary Survey, Earthwork Calculation& Foundation Marking at Aditya Birla Solar Project at Balotra, Barmer RajasthanRamawat Construction Pvt. Ltd.5
10Stake Out of foundation , Leica Total Station on rent at Moserbaer Solar Project, Porbandar, Gujarat.Ramawat Construction Pvt. Ltd.50
11Structure foundation marking at Vikram Solar Project, Manchitiya, Jaisalmer, Raj.Surya International40
12Contour Survey, Boundary Survey, Earthwork Calculation & Foundation Marking at Abhijeet Group Thermal Solar Project at Nokh, Jaisalmer RajasthanRamawat Construction Pvt. Ltd.50
13Stake Out of foundation and Estimation at Godavari Green Solar Thermal Power Project, Nokh, Jaisalmer, Raj.Ramawat Construction Pvt. Ltd.50
14Point Stake out by Leica Total Station at Moserbaer Solar Project, Patdi, Surendra Nagar, GujaratSurya Heighon Pvt. Ltd.30
15Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Stakeout at Sun Edison Energy, Ugras Pokhran, Jaisalmer, Raj.Juwi India Renewable Energy Pvt. Ltd.25
16Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground BMD, Pvt. Ltd. Solar PV Power Plant, Kolayat, Bikaner, RajasthanAEG Power Solutions (India) Pvt. Ltd.5
17Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground Oil India Ltd. Rajgarh, Jaisalmer, RajasthanMoserBaer Solar Ltd.5
18Geotechnical Investigation, Surveying, Earth Resistivity Test & Layout Marking on ground, Pile Pullout Test, Lateral Load & compression Load Test, Oswal Woolen Mills Ltd. Solar ProjectKolayat, Bikaner, RajasthanAEG Power Solutions (India) Pvt. Ltd.5
19Topography Survey, Soil Testing, Electrical Resistivity Test at U.P. Ceramics & Potteries Ltd. Solar Power Plant, Bikaner, RajasthanU.P. Ceramics & Potteries Ltd.2.5
20Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Stakeout at KSK Energy Ventures Ltd. Solar Plant, Kolayat, Bikaner, Rajasthan.Refex Energy Ltd.10
21Topographical Survey By Leica DGPS, Soil Testing SPT, ERT Test & Leica Total Station on Rent for Stake out at Atha Group Solar Plant, Kolayat, Bikaner, Rajasthan.Refex Energy Ltd.10
22Topographical Survey By Total Station, True North Survey by Leica DGPS, Pullout Test, Soil Testing SPT, ERT Test & Stakeout at M/S Roha Dychem Pvt. Ltd, Solar Power Plant in Bhadla, Bap, Phalodi, Rajasthan.Waaree Energies Pvt. Ltd.28
23Land Survey with DGPS GS10 and Leica Total Station on hire for Cepco Industries Pvt. Ltd.Riti Energy Pvt. Ltd.1
24Land Survey with DGPS GS10 and Leica Total Station on hire for Agrawal Renewal Energy Pvt. Ltd.Riti Energy Pvt. Ltd.3
25Pile foundation Pullout, Lateral & Compression Load Test, True North Survey and Bench mark (TBM) Fixing by Leica DGPS GS10. Stake out of Foundation. at NTPC 50MW Solar Power Project, EPC Contractor by TATA Solar, Rajgarh Madhya Pradesh(MP)Nuevosol Energy Pvt. Ltd.50
26Topographical Survey, Geotechnical Investigation, ERT Testing, Pullout Test, Lateral Pile Load Test, True North Survey by DGPS. at Palimarwar Solar Project Pvt. Ltd. EPC by IBC Solar, Raaid Village Pokhran, RajasthanPalimarwar Solar Project Pvt. Ltd.25
27Pullout Test, & Lateral load Test as per IS 2911-Part4, Boundary Survey by DGPS & Stake out of all foundation Point on field by Total Station at Juwi India Solar Project, Shajapur, MPNuevosol Energy Pvt. Ltd.50
28Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at 96 MW ACME Solar Project, Bari Sid Village, Baap, Phalodi JodhpurWaaree Energies Pvt. Ltd. & Sunraign Energy Pvt. Ltd.48
29Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at 96 MW ACME Solar Project, Bari Sid Village, Baap, Phalodi JodhpurNuevosol Energy Pvt. Ltd.48
30Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Vikram Solar Project, Agar, MPNuevosol Energy Pvt. Ltd.50
31Pullout Test, & Lateral load Test, Compression Test on Concrete Foundation as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Juwi India Renewable Energy Solar Project, Solar Park, Charnka, GujaratNuevosol Energy Pvt. Ltd.50
32Pullout Test, & Lateral load Test on Concrete Foundation as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at Solar Direct, Solar Project, Pokhran, RajasthanNuevosol Energy Pvt. Ltd.35
33Pile foundation Pullout (Vertical) Load test, ERT Test, and stake out at Azure Power Solar Project, Baori, Jodhpur, RajasthanAzure Power Ltd.100
34Topographical Survey, Contouring Grid level at 5mx5m, Pullout Test, & Lateral load Test as per IS 2911-Part4, Stake out of all foundation Point on field by Total Station at ACME Solar Project, Ichhawar, Bhopal, MPNuevosol Energy Pvt. Ltd.100
35Pullout Test as per IS 2911-Part4, Welspun Solar Tech Pvt. Ltd. Musiri, Tiruchirapplai, Tamil nadu.Sub Contractors200
36Soil Testing at Moserbaer Solar Ltd. at Kharu Leh, J&KMoserBaer Solar Ltd.0.5
37Survey at TecSo Global Pvt. Ltd. Solar Project.Tecso Global Pvt. Ltd.5
38Pullout Test as per IS 2911-Part4, Azure Power India, Karnataka Azure Power Ltd.10
39Pullout Test as per IS 2911-Part4, Azure Power India, Jaisalmer India BorderAzure Power Ltd.5
40Pullout Test as per IS 2911-Part4, Rays Power Infra.Rays power infra ltd.50
41Pullout Test as per IS 2911-Part4, Juwi india Solar Project, Madurai, Tamilnadu. Meera Enterprises 10
42Pullout Test at ACME Dharamvaram, Anantpur, APNuevosol Energy Pvt. Ltd.50
43Pullout Test at ACME Hindupur, Anantpur, APNuevosol Energy Pvt. Ltd.50
44Pullout Test at GMR, International Airport HyderabadNuevosol Energy Pvt. Ltd.5
45Pullout Test at Surya Urja Company of Rajasthan Ltd. & IL&FS Energy Joint venture 3rd Phase Solar Park at Bhadla, Jodhpur, RajasthanCEG Test House1000
46Pullout Test at 350MW Mahindra Solar Project Gani, Karnool, APMahindra Susten Pvt. Ltd.350
47Pullout Test as per IS 2911-Part4, Azure Power India, Three Projects 40MW, 40MW & 50 MW Chitradurga, KANuevosol Energy Pvt. Ltd.130
48Pullout Test as per IS 2911-Part4, Azure Power India, Karnool, Andhra PradeshNuevosol Energy Pvt. Ltd.100
49Pullout Test as per IS 2911-Part4, 20MW Solair Direct ,Chegunta, Medak, TelanganaNuevosol Energy Pvt. Ltd.20
50Topographical Survey, Contouring Grid level at 5mx5m, Pullout Test, & Lateral load Test as per IS 2911-Part4, at First Solar Tandur TelanganaAppoline61.38
51Pile foundation Pullout, Lateral & Compression Load Test, Torrent Power SuratWaaree Energies Pvt. Ltd.75
52Pile foundation Pullout, Lateral & Compression LoadTest and Stakeout at Hindustan EPC, PunjabNuevosol Energy Pvt. Ltd.35
53Pile foundation Pullout, Lateral & Compression Load Test, RT Renewable EnergyHarsha Abukus18
54Pile foundation Pullout, Lateral & Compression Load Test, Trydence Group Ltd.Tata International Ltd5
55Pile foundation Pullout, Lateral & Compression Load Test, Azure Power BiharNuevosol Energy Pvt. Ltd.10
56Pile foundation Pullout, Lateral & Compression Load Test, BoschTata International Ltd5
57Topographical Survey By Leica DGPS & Total Station at Plot no. 7 (NTPC) & 9 (Fortum) of Bhadla Solar Park II Jodhpur, RajasthanTata Power Ltd.140
58Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at Plot no. 1 & 2 of Bhadla Solar Park II Jodhpur, RajasthanAright Green Power Pvt. Ltd.140
59Geotechnical Investigation,Earth Resistivity Test, Topographical Survey By Leica DGPS & Total Station at Plot no. 8&10 of Bhadla Solar Park II Jodhpur, RajasthanSolaire Surya Urja Pvt. Ltd.140
60Pullout Test as per IS 2911-Part4, 5MWp, Hindustan EPC Pvt. Ltd., Tezpur, Guwahati, AssamNuevosol Energy Pvt. Ltd.5
61Pullout Test as per IS 2911-Part4, 5MWp, Gamesa Renewable Pvt. Ltd. Solar Park, UttarakhandNuevosol Energy Pvt. Ltd.5
62Pullout Test at Jaipur International Airport Ujaas Solar Power PlantNK Infra Pvt. Ltd.5
63Pullout Test at 50 MWp Mansur MPLanco Solar Energy Pvt. Ltd.50
64Pullout Test at Madanapalle, Chittor APSterling & Wilson Pvt. Ltd.30
65Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at SkyPower Telangana 4x50 MWpSterling & Wilson Pvt. Ltd.200
66Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station at Atha Group 50 MWpSterling & Wilson Pvt. Ltd.50
67Pullout Test as per IS 2911-Part4, 100MW Orange Renewable Energy, Dhule MaharastraTata International Ltd100
68Pullout Test as per IS 2911-Part4, 69MW Suzlon, Dhule MaharastraTata International Ltd69
69Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Transform Sun Energy, TelanganaSterling & Wilson Pvt. Ltd.100
70Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Azure Power, TelanganaTata International Ltd100
71Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Azure Power, UPTata International Ltd30
72Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Mirzapur, UPNuevosol Energy Pvt. Ltd.50
73Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at ESSEL Infra, Orai, UPNuevosol Energy Pvt. Ltd.50
74Pile foundation Pullout and Lateral Load Test as per IS 2911-P4 at Gamesa, Karnataka Gamesa Renewable Pvt. Ltd. 50
75Pullout Test as per IS 2911-Part4, 30MW Orange Renewable Energy, Charanka, Gujarat Nuevosol Energy Pvt. Ltd.30
76Geotechnical Investigation, Surveying, Earth Resistivity Test & Pile Pullout Test, Lateral Load & compression Load Test, APGENCO Plot 1 & 3Vikram Solar200
77Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Light Source at Wagdhary MaharashtraSterling & Wilson Pvt. Ltd.50
78Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for JBM Solar at Chalis Gaon, Mahrashtra.Sterling & Wilson Pvt. Ltd.100
79Pullout Test, & Lateral load Test, Compression Test on Concrete Foundation as per IS 2911-Part4, Chalis Gaon, MahrashtraJuwi India Renewable Energy Pvt. Ltd.100
80Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Solar Edge Power at Jalgaon, MaharashtraSterling & Wilson Pvt. Ltd.50
81Geotechnical Investigation,Earth Resistivity Test, Pile Pullout & Lateral Test & Topographical Survey By Leica DGPS & Total Station for Infosys at Sira KarnatakaAnchor Electrical (Panasonic)25
82Pile foundation Pullout (Vertical), Lateral & Compression Load test for IL&FS Energy at Belgam, KarnatakaSterling & Wilson Pvt. Ltd.50
83Pile foundation Pullout (Vertical), Lateral & Compression Load test for AMplus Solar at KarnatakaSterling & Wilson Pvt. Ltd.100
84Pile foundation Pullout (Vertical), Lateral & Compression Load test for Rewa Solar Park at MPMahindra Susten Pvt. Ltd.100
85100 MW UPC Solar PV Power PlantSterling & Wilson Pvt. Ltd.100
86250 MW Solar PV Power ProjectBelectric Photovoltaic India Pvt. Ltd.250
87SECI Rajasthan J(R8) 300 MW (Trench III)Azure Power India Pvt. Ltd.300
8835 MW AC Solar PV Power PlantSterling & Wilson Pvt. Ltd.35
89300 MW Avaada Solar Power Project, Surendranagar GujratAvaada Power Pvt. Ltd.300
90250 MW Solar PV Power ProjectBelectric Photovoltaic India Pvt. Ltd.250
91NHPC 380 MW O2 Solar Power ProjectAltra Xergi Power Pvt. Ltd.380
92300MW SBE Project, PokhranSoft Bank Six Pvt. Ltd.300
93150 MW Solar Power ProjectHild Energy Pvt. Ltd.150
9470 MW Solar Power PlantLalganj Power Pvt. Ltd.70
95300 MW Solar Power ProjectAvaada Sunce Energy Pvt. Ltd.300
96390 MW Hybrid Project, Madhopura Jaisalmer RajasthanAdani Green Energy Ltd.390
9730 MW Amplus Solar Power PlantSterling & Wilson Pvt. Ltd.30
9840 MW Solar Pv PlantCMES Power 2 Pvt. Ltd.40
99SECI ISTC 300 MW TRANCHE-4(R9)Azure Power Maple Pvt. Ltd.300
100100 MW SPV Power Plant GSECLBHEL100
10145 MW Solar PV Powre Plant AT Khadol GujratJuniper Green Sigma Pvt. Ltd.45
102SPV AC/DC (80MW/112 MW) Solar Power PlantBelectric Photovoltaic India Pvt. Ltd.112
103225 MW (AC) Solar Power Plant SandurJSW Renewable Energy225
104300 MW 2A Hybrid Project KajasarAdani Hybird Energy Jaislmer Two Ltd.300
10526 MW Wind-Solar Hybrid Power ProjectClean Max Powering Sustainability26
106190 MW Solar ParkRising Sun Energy (k) Pvt. Ltd.190